The Technology Department Team will start visiting ALL location to verify and assist in getting systems back on the network after the summer break. With recent changes affecting the entire network, the staff wants to make sure that everyone will have a smooth start to the new year. Further directions will be provided by your local principal and supervisors. Please note the dates for each location the Tech Team will be visiting listed below.
Thank you for your support.
7/21 ECE 7/22 PVE 7/23 SMS
7/27 SHS 7/28 PES 7/29 HMS 7/30 HHS 7/31 KSE
8/3 ACE 8/4 CHS 8/5 CMS 8/6 WCE
8/7 make-up day if neccessary
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment